Tag Archives: Summit County

State Transportation Commission tours UDOT projects in Summit County

PARK CITY — On Thursday, June 25,  the State Transportation Commission toured several areas in Summit County to see current and recent roadway improvement projects in the county.

The Utah Department of Transportation (UDOT) has been working with Summit County, Park City, and Snyderville Basin Parks, Trails and Recreation on improving transportation routes in the area.

“Summit County is a popular destination for recreation enthusiasts year-round,”  says UDOT Region Two Director Nathan Lee.  “Keeping the flow of motorists, cyclists, and wildlife moving through the county efficiently and safely is a top priority for us.”

The commission takes a tour of the recreation/wildlife underpass at US-40 in the Snyderville Basin.

The commission takes a tour of the recreation/wildlife underpass at US-40 in the Snyderville Basin.

In the past five years, UDOT has invested $102 million in roadway improvements in Summit County.  Some of those projects include:

-I-80 from Kimball Junction to SR 224 Study

This study looked at different scenarios to expand the capacity of SR 224 near Kimball Junction to accommodate future traffic and improve mobility.  Three recommendations were made, including a 7-lane section on SR 224, a continuous flow intersection at Olympic Parkway/Newpark Blvd., and a third left turn lane from northbound SR 224 to westbound I-80.  A final recommendation has not been chosen and funding for construction has not been secured.

-Wildlife Underpass Crossing at US 40

Completed in November 2014, this new underpass crossing provides recreational access and connectivity west of US 40 with the Frontage Road east of US 40.  The underpass also enhances safety for drivers and trail users, while at the same time reducing auto-wildlife crashes.

-SR 224 between Richardson Flat and Round Valley Drive

UDOT repaved and widened S.R. 248 to five lanes (two general purpose lanes in each direction with a two-way left turn lane) from Richardson Flat Road to Round Valley Drive. The project also included the installation of bike lanes from Wyatt Earp Way to Richardson Flat Road and intersection improvements at Richardson Flat Road and S.R. 248.  This project was completed in 2013.

The Commission stopped at S.R. 248, east of Comstock Drive to view a pedestrian tunnel near Treasure Mountain Middle School in Park City.

The Commission stopped at S.R. 248, east of Comstock Drive, to view a pedestrian tunnel near Treasure Mountain Middle School in Park City.

-SR 224 between Bear Hollow and I-80

UDOT completed a three-inch repaving on S.R. 224 from Bear Hollow to the I-80 interchange in July 2014.  The project also included new radar signal detection, pedestrian ramp upgrades and a shared shoulder for Park City Transit buses/ bikes on the east side.

Current projects under construction include the following:

-I-80 between Silver Creek and Wanship

This $43 million project replaces asphalt, upgrades drainage systems, and installs overhead variable message signs (VMS) to better communicate road conditions on Interstate 80 between Silver Creek and Wanship.  Construction began in December 2014 and is scheduled for completion in late 2015.

i-80 Bridge Demolition near Wanship We shared with you earlier about the construction going on near Wanship on I-80. Now, we’ve got a video to show how we teamed with Geneva Rock Products to take down the bridge.

Posted by Utah DOT on Wednesday, May 6, 2015

 

-Judd & Hobson Lane Bridges at I-80

This $2.7 million renovation project prolongs the life of the both the Judd and Hobson Lane bridges along Interstate 80 between Coalville and Hoytsville.  Originally built in 1967, the bridges provide connectivity and enhance safety for drivers.  Renovations began in June 2015 and are scheduled for completion in the fall of 2015.

Upcoming projects in Summit County include the following:

-New westbound truck lane on Interstate 80 between Parley’s Summit and Jeremy Ranch

To improve mobility and enhance safety on Interstate 80, UDOT is designing a passing truck lane between Parley’s Summit and Jeremy Ranch.  The $17 million design project will begin in 2017.

-US 40 bridges near Jordanelle Reservoir

This $4.2 million project will preserve seven bridges near the Jordanelle Reservoir, which are frequently used by motorists visiting the area for recreation.  The bridges were originally built over 20 years ago. Bridge preservation work begins in 2016.

For a complete list of current and future projects in Summit County, visit the UDOT Projects page.

This guest post was written by Region Two Communications Manager Agustin Avalos. 

I-80 Crash Silver Barrel Awards

Executive Director Carlos Braceras awarded twelve Region Two employees with a Silver Barrel Award for their efforts related to a semi crash on I-80 that closed the road for several hours. Details of their efforts are below and the recipients included:

  • Shane Bushell
  • Rick Debban
  • Nick Jarrett
  • Robert Miles
  • Cody Moore
  • Stuart Ovard
  • Rick Potter
  • Bryant Richins
  • Jason Richins
  • Layne Thornton
  • Dottie Weese
  • Ron Williams

On July 16, 2014, Summit County Dispatch called Bryant Richins the Echo Station Supervisor around 5 a.m. and asked him to respond to a semi crash on I-80 westbound in Echo Canyon.

Due to the severity of this crash and with both semis on fire, I-80 was closed in both directions.

Bryant and his crew provided the traffic control and set up a left lane closure from the Echo Port of entry to the maintenance turnaround at milepost 183. This provided emergency vehicles a way to travel westbound if they needed to get past the crash scene.

I-80 eastbound was opened to one lane of traffic around 8 a.m. The crew was then asked for material to contain the water and hazardous runoff from fighting the fire. Two trucks from the Wanship Station hauled material up and contained the runoff.

The crew then started to assist in the clean up of the crash but the fireman in charge was concerned with the possibility of the loads flaring up. They discussed several possibilities and it was decided the UDOT crew would tip the loads over with their loader so they could get water on it to better extinguish the smoldering fire. This alone was estimated to save a couple of hours in the clean up of the accident.

The UDOT Echo Crew then worked with the tow company and firemen and offered to use their four UDOT ten wheel dump trucks and loader to haul the debris to the landfill. The Summit County Fire Department tried to cut up the burnt semis with their chop saws but it was taking too much time. Bryant offered to have his equipment operator go in with the loader and smash and roll up the debris and then load it in to UDOT’s ten wheelers. This saved an estimated four hours. Bryant then proposed his plan with the UDOT Area Supervisor and called Morgan Asphalt around 9 a.m. to notify them he would need their services in Echo Canyon to rotomill and repave the damaged/burnt asphalt. The crash debris was cleaned up and Morgan Asphalt was able to start rotomilling and paving around 2 p.m. The interstate was repaved and all lanes open to traffic by 5:45 p.m.

This is a great example of successful partnering with Utah Highway Patrol, Summit County Law Enforcement, Summit County Fire Department, Summit County Health Department, Moores Towing, the UDOT Incident Management Team, the UDOT Region Safety Manager, the UDOT Area Supervisor, UDOT Wanship Station 236, and UDOT Echo Station 238! Due to this successful partnering they were able to safely reopen Interstate I-80 and estimated 6 hours early.

This guest post was taken from the Silver Barrel nomination written by Todd Richins, UDOT Region Two East Area Supervisor.