Tag Archives: EIS

Uinta Rail & Roads Project Underway

Photo of a tanker truck going down the road.

A tanker drives through a pavement project on U.S. 40 in Vernal — one strategy to meet future transportation needs in the Uinta Basin is to define a standard cross section for consistent lane widths and shoulders.

UDOT Region Three has a leadership role in planning for the future transportation needs of the Uinta Basin, including Uintah and Duchesne counties.

With planned growth in the Basin, the Uinta Rail and Roads project was initiated to look at different transportation options to enhance economic development.

Craig Hancock, Region Three Engineering Manager, is leading the roads analysis, which is scheduled to be complete late-summer. The project team has been evaluating data including traffic volumes, crash data and pavement conditions in order to prioritize future projects. The results of the study will be incorporated into UDOT’s Long Range Planning process.

John Thomas, Region Three Engineering Manager, is leading the rail EIS project team, which is preparing to publish a Notice of Intent later this year to formally begin the environmental study.

As a rail project, the study will have a different joint-lead than FHWA and likely follow different guidelines and procedures from typical UDOT environmental studies. A draft Environmental Impact Statement (EIS) is anticipated in 2016.

West Davis Corridor Draft EIS

The West Davis Corridor Draft Environmental Impact Statement (EIS) is now available for review and public comment on the study website. The Draft EIS includes our locally preferred alternative. To help explain the process and the our recommendation the study team created the follow videos.

The Draft EIS will be available for public comment for the next 90 days, closing on August 23. Formal comments should be submitted to the study team on the website, by e-mail at westdavis@utah.gov or mailed to:

West Davis Corridor Team
466 North 900 West
Kaysville, UT 84037

There will also be three public hearings and open houses where comments can be submitted.

So, this is your chance to part of the process and to have your voice heard. Please get out there and check out the Draft EIS and submit your comments.West Davis Corridor Logo