Archive for the ‘Optimize Mobility’ Category

When complete in December, I-15 CORE will be the fastest billion-dollar public highway project ever built in the U.S.

September 19th, 2012

WELCOME VISITORS

No Comments, Optimize Mobility, Strengthen the Economy, by Catherine Higgins.

The Utah Office of Tourism and UDOT parnter to help support the economy.

The careful work done in the Body Shop and Heavy Equipment Shop prolongs the life UDOT’s fleet.

Newly trained mechanics are getting work experience at UDOT.

A new national performance metric will help fleet managers make decisions about retaining core equipment.

September 7th, 2012

FEATURING FLICKR

No Comments, Optimize Mobility, Preserve Infrastructure, by Catherine Higgins.

Share your photos of the state transportation system.

September 6th, 2012

OUT OF SIGHT

No Comments, Optimize Mobility, Preserve Infrastructure, by Catherine Higgins.

I-15 CORE project concrete drainage pipes were installed under the freeway without shutting down traffic lanes.

September 5th, 2012

JACKING PIPE

No Comments, Optimize Mobility, Preserve Infrastructure, by Catherine Higgins.

These slides show pipe jacking operations on the I-15 CORE project. Concrete drainage pipes were installed under the freeway using…

August 31st, 2012

WALK MORE 2012

No Comments, Optimize Mobility, by Catherine Higgins.

The “Walk More in Four” challenge offers the chance for schools to win $500, and for students to win bikes and scooters.

The UDOT Blog is intended to inform a transportation audience.