Monthly Archives: January 2018

#WorkForUsWednesday – January 17, 2018

Hey! Want to work for UDOT? Check outCheck out these FOUR positions at UDOT. #WorkForUsWednesday.

Click on the links below to apply and come join a workforce of over 1,600 people, whose mission is to innovate transportation solutions that strengthen Utah’s economy and enhance quality of life.

  • Recruitment #14656 – Motor Carrier Tow Truck Investigator (Motor Carrier Spec III), Complex – Motor Carrier Administration, Opens 1/11/18, Closes 1/18/18.  Click here to apply.
  • Recruitment #14659 – UDOT Contract Manager/Analyst (Purchasing Manager), Complex – Procurement, Opens 1/11/18, Closes 1/22/18.  Click here to apply.
  • RE-OPENING Recruitment #14208 – Transportation Technician II – Region 4 – Richfield Paint Crew, Opens 1/16/18, Closes 1/28/18 Click here to apply.
  • Recruitment #14654 – Roadway Design Engineer (Engineer III) – Region 4 – Richfield, Opens 1/16/18, Closes 1/23/18 Click here to apply.

PRESS EVENT: UDOT and DPS to release preliminary 2017 traffic fatality numbers

UDOT and DPS to release preliminary 2017 traffic fatality numbers

New safety campaign launched to cut down on distracted driving

WHAT: On Wednesday, the Utah Department of Transportation (UDOT) and the Department of Public Safety (DPS) will release preliminary traffic fatality numbers for 2017 and kick off a new safety campaign aimed at reducing distracted driving. UDOT and DPS leaders will be available at 9:30 a.m. for one-on-one interviews.

Prior to the media availability, the preliminary 2017 fatalities report will be emailed to media around 8 a.m. Wednesday to allow time for review.

 

WHEN: Wednesday, January 17, 2018, at 9:30 a.m.

 

WHO:

  • UDOT Executive Director Carlos Braceras
  • DPS Commissioner Keith Squires

VISUALS:

  • Infographics of 2017 fatality numbers (which will be made available digitally and in print).
  • Display of new Zero Fatalities distracted driving campaign materials. Campaign assets will be made available digitally.

WHERE:
Calvin Rampton Complex, Redwood Rooms A&B
4501 South 2700 West, Taylorsville, UT

 

MEDIA CONTACT:
John Gleason
UDOT Public Information Officer
jgleason@utah.gov

Lt. Todd Royce
UHP Public Information Officer
801-556-8261
troyce@utah.gov

#WorkForUsWednesday – January 10, 2018

You made it! Welcome to another #WorkForUsWednesday here at UDOT.  Check out these FIVE positions at UDOT.

Click on the links below to apply and come join a workforce of over 1,600 people, whose mission is to innovate transportation solutions that strengthen Utah’s economy and enhance quality of life.

  • Recruitment #14593 – Financial Manager II, Complex – Comptroller’s Office, Opens 1/4/18, Closes 1/11/18.  Click here to apply.
  • Recruitment #14313 – Region Administrative Services Manager, Region 2 Headquarters, Opens 1/4/18, Closes 1/18/18.  Click here to apply.
  • Recruitment # 14453 – Materials Technician IV (Engineering Technician IV), Opens 01/08/2018, Closes 01/17/2018, Region 2 – SLC. Click here to apply.
  • Recruitment # 14454 – Transportation Technician III, Opens 01/08/2018, Closes 01/17/2018, Region 2 – SLC. Click here to apply.
  • Recruitment # 14609 – Contract Administrator (Purchasing Agent II), Opens 01/08/2018, Closes 01/16/2018, Complex – SLC. Click here to apply.


 

Visit the Utah State Jobs website at any time to see all open positions with the department. Simply filter the search criteria by department to (810) Department of Transportation. We hope to see you proudly wearing UDOT orange soon.

Utah Department of Transportation FTA Program Public Notice

Utah Department of Transportation FTA Program Public Notice:


The UDOT is currently developing their Federal fiscal year 2017 Transit Asset Management (TAM) plan for its FTA Program. The draft TAM plan can be found on the UDOT website at www.udot.utah.gov/publictransit under the Hot Topics and Quick Links section. It is titled “UDOT FTA Transit Asset Management Plan.

A hard copy is available for review at UDOT Program Development, 4501 S 2700 W, 3 rd Floor, Salt Lake City, UT 84114.

Comments may be provided to the UDOT via email at publictransit@utah.gov or via mail addressed to UDOT Program Development, Attn: Public Transit Plans and Programs Director, 4501 S 2700 W, P.O. Box 143600, Salt Lake City, UT 84114-3600.

Please include the page number, section number, and a detailed comment with your submission. The document will be available for review from January 9, 2018 through and including February 8th, 2018 (30 days) and comments will be accepted through February 23rd, 2018 (45 days). Only comments related specifically to the development of the TAM plan will be accepted. All other UDOT or TAM-program related comments should be directed to the appropriate contact provided on the main UDOT website.

#WorkForUsWednesday – January 3, 2018

New year, new #WorkForUsWednesday. Now is a great time for a career change. Check out these TWO positions at UDOT. They’re both for Transportation Technicians. Transportation Technicians are the frontlines of UDOT maintenance, responsible for snow removal and road repair. Many of our senior leaders started their UDOT careers as Transportation Technicians. 

Click on the links below to apply and come join a workforce of over 1,600 people, whose mission is to innovate transportation solutions that strengthen Utah’s economy and enhance quality of life.

  • Recruitment #14465 – Transportation Technician II, Region 1 –Riverside, Opens 12/20/17, Closing date extended to 01/07/18. Click here to apply.
  • Recruitment #14537 – Transportation Technician II, Region 4, Delta, Opens 1/02/18, Closes 1/14/18 Click here to apply.

Visit the Utah State Jobs website at any time to see all open positions with the department. Simply filter the search criteria by department to (810) Department of Transportation. We hope to see you proudly wearing UDOT orange soon.

NEWS RELEASE: New Revisions to the US-89 Draft State Environmental Study Released

For Immediate Release

New Revisions to the US-89 Draft State Environmental Study Released

Updates information and input received since first draft was released in October 2017

 

OGDEN – The Utah Department of Transportation has released revisions to its draft State Environmental Study for the US-89 corridor in Davis County.

Since the initial draft of the US-89, Farmington to I-84 State Environmental Study (SES) was released in October of last year, the UDOT study team has continued to review all public input, and has now revised and made other refinements to the draft document.  The revised draft is now available for public review on the project website at “www.udot.utah.gov/us89.”

A public hearing is scheduled for January 16, and will be held at Davis High School, 325 Main Street, Kaysville, from 4:30 to 7:30 p.m.  The public is invited to the hearing to participate in the discussion about the environmental study, the future expansion of US-89, and to make comments regarding these revisions.  Comments can also be made on the project website, via email at “us89@utah.gov” or through the mail at P.O. Box 1033, Farmington, UT 84025.  The public comment period begins January 2, and will extend through February 3.

UDOT has prepared an informative video explaining the study process followed during the present state environmental study.  The video can also be found on the study website at “www.udot.utah.gov/us89.”

The public is encouraged to visit the project website for more detailed information about the project, to sign up for email updates, and to view the refined study document.  Questions or concerns should directed to the Study Hotline at 888-752-8789.

 

-UDOT-

UDOT Region One
Contact: Vic Saunders
Office: (801) 620-1641
Mobile: (801) 726-4120
E-mail: vsaunders@utah.gov
Twitter: @UDOTRegionOne

 

NEWS RELEASE: I-15 to Close for Two Nights in Box Elder County This Week

For Immediate Release

 

I-15 to Close for Two Nights in Box Elder County This Week

Interstate closure will allow crews to build new bridge over I-15 in Honeyville 

SALT LAKE CITY (Jan. 2, 2018) – The Utah Department of Transportation (UDOT) advises northern Utah drivers to plan ahead for two overnight closures on I-15 in Box Elder County this week. I-15 will close in both directions at Exit 372 in Honeyville on Wednesday, Jan. 3, and Thursday, Jan. 4, from 8 p.m. to 8 a.m. each night for bridge construction.

While crews install new steel beams for the new bridge, UDOT will divert all I-15 traffic onto the off- and on-ramps at exit 372 in Honeyville. Drivers will still be able to continue on I-15, but will need to plan for reduced speeds and moderate delays and allow extra time to travel through the detour. Motorists with time-sensitive travel should consider using alternate routes, such as parallel SR-13, at either Elwood or Corinne, or via SR-38, at either Collinston or Brigham City. Intermittent lane closures on I-15 may take place through the remainder of the week.

Then, on the nights of Monday, Jan. 8 and Tuesday, Jan. 9, northbound I-15 will be closed in this area for bridge work. All lanes on southbound I-15 will remain open during this time. Construction on this project is scheduled for completion this spring.

For further information about the I-15 Honeyville Interchange project, drivers can call the project hotline at 801-901-4064, email the project team at honeyvillebridge@utah.gov, or visit the project website at www.udot.utah.gov/go/honeyvillebridge.

-UDOT-

Media Contact:
John Gleason
UDOT Public Information Officer
jgleason@utah.gov
Cell: 801-560-7740