June 27th, 2013

Parley’s Canyon Pipe Replacement

Optimize Mobility, Preserve Infrastructure, by Sarah Stephenson.

I-80 Drainage Pipepipes 1

UDOT is working with W.W. Clyde and Geneva Pipe to begin the replacement of an old drainage system in Parley’s Canyon. The construction, which started at the end of May, begins at the mouth of Parley’s Pipes 2Canyon on I-80 and will extend about 2.5 miles east into the canyon. The pipe will serve to drain Salt Lake City’s excess water as well as the canyon runoff.

The current 50-year-old pipe is buried, in some areas, more than 30-40 feet under the freeway. Crews will work to replace the deteriorating corrugated steel pipe with a new durable concrete pipe. The sections of pipe that are currently underground will be capped off and filled.

This blue metal casing is placed over the wired frame and then transported to the cement pouring deck.

This blue metal casing is placed over the wired frame and then transported to the cement pouring deck.

The new system will be built to the side of the road to make service and maintenance more manageable. This will also keep closures and impacts to a minimum during construction and future maintenance.

Each section of pipe weighs about 25,000 pounds and is 12 feet long. Geneva Pipe creates these massive cement structures at their site in Orem. The specific cement used is built to endure harsh conditions and erosion over time.

The cement is then poured and quickly mixed into the metal casing on the deck.

The cement is then poured and quickly mixed into the metal casing on the deck.

The pipes are made in the Geneva warehouse where the cement is poured into a metal casing that is tightly compacted to create large vertical cylinders that will dry overnight. The type of cement used dries fast because of the way that it is quickly sifted and tightly compacted under extreme amounts of pressure.

These are the wet concrete pipes that will dry overnight.

These are wet concrete pipes that will dry overnight.

Overnight blasting for the construction has already begun and drivers should expect up to 15 minute delays while blasting occurs.

Overnight lane restrictions will also be necessary but one lane in each direction will remain open. Motorists should expect delays, a reduced speed limit and lane closures throughout the project until November 2013. At least three lanes will remain open during high traffic times, including events and on weekends.

Here is a video of the blasting happening at I-80.

Back Top

Responses to “Parley’s Canyon Pipe Replacement”

  1. As we all know, the concrete pipe with high compressive strength, high capacity, good ductility, excellent seismic performance. Steel concrete structure construction, reinforced with steel pipe can be used as bear the construction phase of the construction loads and structural weight, construction concrete curing time is not affected. Pouring concrete steel pipe steel pipe exposed area is reduced by the external gas corrosion area is much less than steel, corrosion and corrosion than steel cost savings. So it is a good choice to replace the deteriorating corrugated steel pipe with a new durable concrete pipe.

  1. No trackbacks yet.

Leave a Reply

Back Top